When purchasing led line lights, you must carefully select high-quality
The LED line light brand is relatively expensive to install. It's not easy for the average light bulb installer to do that. Whether it is installation or maintenance, it must be removed with a hoisting rope or steel pipe scaffolding. Therefore, TOYAM reminds customers to buy LEDs. Linear lamps must be carefully selected to obtain high quality, which can reduce the cost of future repair and maintenance of lamps.
Preparations for installing led line lights:
1. Carefully read the design renderings and installation schematics of the new project, and fully grasp the key technical factors of the new project.
2. Fully grasp the technical characteristics, main parameters, and installation common problems of commonly used LED strip light brands.
3. Effectively plan the power transmission and transformation circuit lines, switching power supply, power circuit manipulation and safety precautions of lighting engineering buildings.
4. Install a variety of machinery and equipment and special tools to carry out safety inspections.
5. Check whether the products, spare parts and auxiliary materials are available. Such as installation connectors, waterproof transformers, LED guardrail light control panels, male and female power plugs, super five network cables, two-core power plugs, self-tapping screws, plastic expansion screws, etc.

The led line light brand is generally used for landscape lighting, and sometimes it will be more and more difficult to install. In addition, different installation parts also have different installation methods.
Installation on red brick walls is common on cement walls. Generally, the aluminum led linear light is fixed and installed on the wall, and then installed and fixed with anchor bolts.
Some areas installed on roller coaster axle bridges, such as roller coasters and bridge tubes, are metal composite materials and should not be punched. A moderate installation method is to first make a hole at the bottom of the aluminum groove of the LED linear light, and then fix it on the guardrail with a strap.
Installed on the glass curtain wall Today, many multi-storey buildings, hotels and hotels are all glass curtain walls, and there is no way to open holes. Apply structural adhesive to fix the installation! It is generally installed on the glass curtain wall, and then the cabinet is spray painted with the opposite paint, and try to hide the lights of the LED wire.
Benwei Lighting is an LED Tube, LED flood light, LED Panel Light, LED High Bay, LED manufacturer with 12 years of experience. If you want to purchase a high-quality LED flood light or have a more in-depth understanding of the application of LED flood lights, please contact send us inquiry, our web:
https://www.benweilight.com/.




