1. Installation of foundation embedded parts:
2. Excavation of foundation pits to survey geological conditions. If the soil is hard, a pit of about 1 cubic meter will be excavated at the location where the lamps are installed. If the soil is soft or has special requirements, the depth of excavation will be determined separately.After confirming the lamp pole position, confirm that the battery box is buried well, and the distance from the lamp pole is about 0.5 meters.
3. Foundation pouring puts the battery box template into the battery box pit, and the foundation pre-embedded parts are placed in the center of the foundation pouring pit. Then one end of the PVC pipe is placed in the interface of the battery box, and the other end is passed through the upper fixed plate of the base part in the foundation pouring pit.Finally, C20 concrete is poured densely.It is best to use the vibration pump when pouring to make the concrete more even and firm.