Knowledge

Home/Knowledge/Details

Talking about the matters needing attention in the installation of high pole lights

Talking about the matters needing attention in the installation of high pole lights


Installation preparations for high pole lights

1. Carefully count all components according to the loading and packing list.


2. Check whether the components are damaged, bent or twisted, and whether the zinc layer is damaged.


3. The sign on each rod body indicates the type of rod body, the order number, and the number of sections. The weight of the shaft is marked with a colored pen on the inside of the shaft. Check whether the delivery is correct and whether the crane lifting capacity is sufficient.


4. According to the large sleeve and small sleeve length provided on the drawing, mark on the rod body for use in sleeve connection.

 

=

Install


1. Each splice provides a socket length, but due to the influence of manufacturing, installation errors and physical factors, there are variations in socket length, so large socket length and small socket length are provided.


2. In order to facilitate installation, it may be necessary to lubricate the mating surfaces. Be careful not to use lubricating oil to prevent leakage and contamination of the rod body, and soapy water can be used to lubricate the inner and outer surfaces of the sleeve.


3. Necessary force should be applied at both ends when socketing to obtain a tight socket.