(1) Field survey of roads, fix points of solar street lights, and mark them for later construction work.
(2) Organize personnel and machinery to carry out the construction of the lamp pole pre-buried pit.
(3) Put the embedded parts of the light pole (the embedded parts are welded by steel bars to fix the light pole), and pour concrete.
(4) After waiting for the embedded parts and concrete to be fixed, prepare for the hoisting of the light pole.
(5) Before hoisting the light pole, install the corresponding battery board, battery board bracket, light arm, lamp, and light pole wiring in place on the ground. After the installation is in place and the inspection is correct, use a crane to lift the light pole.
(6) Perform a light-up test after the lifting is completed. After the test is completed, adjust the light pole.
(7) If the secondary pre-embedding is required, the secondary pre-embedding (cover the bolts exposed on the ground with cement) does not require surface treatment.
(8) Complete all installation work